To hold palletized rolls of film, Smith Material Handling and Workspace Solutions supplied and installed Steel King SK2000 closed tubular rack along with 48 inch high columns guards and J&L galvanized wire mesh decking.
We have completed several other projects at this facility, some of which include a Cubic Design mezzanine with a PortaFab modular office above, Met-Track enclosed track bridge cranes, and Collision Awareness traffic alert systems.
We are excited to work on the next project with the fantastic team at Charter NEX Films.
To hold palletized rolls of film, Smith Material Handling and Workspace Solutions supplied and installed Steel King SK2000 closed tubular rack along with 48 inch high columns guards and J&L galvanized wire mesh decking.
We have completed several other projects at this facility, some of which include a Cubic Design mezzanine with a PortaFab modular office above, Met-Track enclosed track bridge cranes, and Collision Awareness traffic alert systems.
We are excited to work on the next project with the fantastic team at Charter NEX Films.